The beginning of the work of June 2018, the work is ongoing. The total area of the scaffolding is 76 sq.m. Mounting the stand scaffold without the support on the horizontal surface. To carry out works on strengthening the house, arming seat installation and insulation of the facade. Address: Lviv, st. Lychakivska, 47